Checkwall on McArdle Lateral - November 2021Ensures water deliveries to headgates with lower water flows. The District has installed several of these in the past few years.
Main Canal Maintenance - November 2021Repaired eroded canal banks, reshpaed canal bottom for smoother water flow and releved ditch road.
New Main Canal Delivery Construction - December 2021Eliminated dual box and provides more efficient water delivery
Flume Repair - December 2021Annual inspection and replacement of rusted metal sheets and connecting rods on flume.