Skip to main content

May 20, 2021 (P.M.) CANAL REPAIR PROGRESS

The shot-crete process is complete, concrete blankets have been placed over the area and this area will set for 24 hours curing. 

A person is using a hose to spray concrete onto a surface in an outdoor setting.
A worker is spraying concrete onto a sloped surface, likely for construction or landscaping purposes.
A construction site with workers applying concrete to a large, curved surface. Trees and vehicles are visible in the background.
The image shows a construction site with freshly poured concrete forming a curved structure surrounded by trees and parked vehicles.