May 19, 2021 (A.M.) CANAL REPAIR PROGRESS

May 19, 2021 - A.M. This morning at 8:00 a.m. the construction crew was back to complete the final stages of backfilling the hole and have started the repair of the ditch road and then will move to prepping the canal for shot-creting tomorrow morning at 7:00 am.  As the repair progresses there will be more updates.

The image shows an excavator in a dug site, preparing a gravel-covered foundation in a construction area.
An excavator working on a construction site, digging into the earth amid trees and uneven terrain.
The image shows construction equipment working in a dug-out area, laying gravel on the ground for a project.
The image shows construction equipment including an excavator, a dump truck unloading material, and a bulldozer in a wooded area.
Construction site with two excavators working in a dirt trench surrounded by trees.